The two programs are served by a common core of facilities that provide all support needs for both programs. The school-within-a-school concept supports two distinct student bodies: a K-2 program and a 3-5 program. Each building functions as a school-within-a-school serving a total population of 1300 students. ![]() SG developed the three elementary schools as sister schools of the same design. After extensive evaluation of options and District cost impacts, it was determined that three new elementary schools would be developed to replace the nine existing and aging elementary structures and subsequently provide significant savings for the future. The facility assessments and feasibility study, along with an independent demographics analysis performed by DecisionInsite, led the district to a conclusive direction for major District-Wide capital improvements. There are many alumni who are known for their contributions to their community, country and their careers.SG was engaged to complete a District-Wide Feasibility Study for the Bristol Township School District (BTSD) that included existing facility assessments of nine elementary schools, three middle schools and a high school. The District graduated its first class in 1883 the graduating class of 2009 will be the 126th graduating class.įor many years Bristol High School served as a regional High School for students from surrounding communities. ![]() ![]() The School District's first building was built in 1837. The Bristol Borough School District has a long tradition of providing excellent education to prepare students for vocation or further their education.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |